Summary for Test 2025-06-09-100-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 1000402
DEA: 11430384
EFIS: 1118000114
DIST-CO-RTE-PM11-SD-805-23.7/28.5
Award Date10/09/2024
Closeout DateNot set
Work DescriptionREPLACE DRAINAGE, CONCRETE PAVEMENT, AND MODIFY ELECTRICAL SYSTEMS.
Location DescriptionSAN DIEGO COUNTY IN SAN DIEGO FROM 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION TO ROUTE 5/805 SEPARATION
QA Service Level1 (Verified on 11/18/2024)

Sample Information

Sample Taken Date06/09/2025 Sample Unique Key100
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/10/2025
Sample typeQuality Control A brief description of the sampleConcrete Aggs
The quantity of what the sample constitutes2 bags From where was the sample collectedJob Site
First name of sampler or witnessed byGerardo Last name of sampler or witnessed byCordero
Title of samplerTET Telephone number of sampler6199366795
Laboratory sample identification25-06-09-100-S Linked DIME Sample ID
The fabricator/manufacturer/facility nameCal Portland Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Not Provided
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBelt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number00336362 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-06-09-100
DIME Test ID: 2025-06-09-100-3
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-07-11

Test Results


Number of tests: 3
Input Type: Measured
Tester's full name: Shawn Rivers
Date of test: 07/11/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.5
Sand reading (test 1): 3.7
Clay reading (test 2): 4.8
Sand reading (test 2): 3.8
Clay reading (test 3): 5
Sand reading (test 3): 3.8
Sand equivalent (test 1): 83
Sand equivalent (test 2): 80
Sand equivalent (test 3): 76
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters): Complies

Test was verified on 7/11/2025