Summary for Test 2017-11-01-23-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 11/01/2017 | Sample Unique Key | 23 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
| Sample type | Quality Control | A brief description of the sample | RAP ignition 3 |
| The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Dime | Last name of sampler or witnessed by | Test |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Test | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Mustang Pit |
|---|---|---|---|
| Aggregate Size | Not set | Aggregate Source | Not set |
| RAP Stockpile | Not set | Stockpile Size (tons) | Not set |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2017-11-01-23
DIME Test ID: 2017-11-01-23-2
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2017-11-03
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: David Phong
Date of test: 11/03/2017
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.61 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/3/2017 ✔
