Summary for Test 2017-11-01-23-1
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 11/01/2017 | Sample Unique Key | 23 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Quality Control |
| A brief description of the sample | RAP ignition 3 | The quantity of what the sample constitutes | 1 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Dime |
| Last name of sampler or witnessed by | Test | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Test | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Mustang Pit |
|---|---|---|---|
| Aggregate Size | Not set | Aggregate Source | Not set |
| RAP Stockpile | Not set | Stockpile Size (tons) | Not set |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2017-11-01-23
DIME Test ID: 2017-11-01-23-1
Testing Lab: CT HQ - Sacramento Materials Management Branch Field Office
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2017-11-03
Test Results
Input Type: Calculated
Tester's full name: David Phong
Date of test: 11/03/2017
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.9 %
Cumulative percent passing the 3/8 in. sieve: 94.9 %
Cumulative percent passing the 1/4 in. sieve: 68.4 %
Cumulative percent passing the #4 sieve: 49.7 %
Cumulative percent passing the #8 sieve: 45.9 %
Cumulative percent passing the #16 sieve: 37.6 %
Cumulative percent passing the #30 sieve: 29.1 %
Cumulative percent passing the #50 sieve: 21.7 %
Cumulative percent passing the #100 sieve: 15.5 %
Cumulative percent passing the #200 sieve: 10.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/3/2017 ✔
