Summary for Test 2025-06-08-14-7
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000509 DEA: 010H6004 EFIS: 0117000240 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-1-33.7/R51.0 |
| Award Date | 11/25/2024 |
| Closeout Date | 09/29/2026 |
| Work Description | HMA, RHMA, COLD PLANE, GUARDRAIL, AND DELINEATION. |
| Location Description | MENDOCINO COUNTY NEAR ELK FROM 0.1 MILE NORTH OF GREENWOOD CREEK BRIDGE TO 0.2 MILE NORTH OF LITTLE LAKE ROAD AT MENDOCINO |
| QA Service Level | 1 (Verified on 09/20/2024) |
Sample Information
| Sample Taken Date | 06/08/2025 | Sample Unique Key | 14 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/17/2025 | Sample type | Verification |
| A brief description of the sample | PG 58-22 "JMF" | The quantity of what the sample constitutes | 1 Quart |
| From where was the sample collected | Source | First name of sampler or witnessed by | Felipe |
| Last name of sampler or witnessed by | Damian | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Granite - Ukiah | |
| Transportation Laboratory (TL) Number | C778801 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Granite Ukiah | |
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2025-06-08-14
DIME Test ID: 2025-06-08-14-7
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-07-09
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 07/02/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 210.471 grams
Mass of container #2 before test (m2i): 209.723 grams
Mass of container #1 after test (m1f): 210.280 grams
Mass of container #2 after test (m2f): 209.550 grams
Mass of empty container #1: 175.394 grams
Mass of empty container #2: 174.212 grams
Mass correction factor: 0.030
Average mass change: -0.486 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 7/9/2025 ✔
