Summary for Test 2025-07-07-18-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 993678 DEA: 042Q8004 EFIS: 0419000050 COOP: 042836,042944 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4 |
| Award Date | 01/22/2025 |
| Closeout Date | Not set |
| Work Description | US 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/15/2022) |
Sample Information
| Sample Taken Date | 07/07/2025 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/07/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Subbase |
| The quantity of what the sample constitutes | 2600g | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jacob | Last name of sampler or witnessed by | Vega |
| Title of sampler | Mozamo Consultant QA | Telephone number of sampler | |
| Laboratory sample identification | SJ-070725-ASB1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Imported from previous contractor job | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Hwy 101 SB Lt "FI" Line Drainage System No. 2 & 3, Roadway Section | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite - Compacted Aggregate Subbase backfill | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-07-07-18
DIME Test ID: 2025-07-07-18-2
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-07-07
Test Results
Is oversize material: No
Input Type: Calculated
Tester's full name: Jacob Vega
Date of test: 07/07/2025
In-place wet density: 2.24
Highest adjust wet density: 2.42
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 93
General comments (publicly viewable) (Max 1000 characters): Hwy 101 SB Lt "FI" Line Drainage System No. 2 & 3, Roadway Section
Test was verified on 7/7/2025 ✔
