Summary for Test 2025-06-12-89-1
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 995489 DEA: 07344204 EFIS: 0718000046 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,710-23.2/36.3,21.9 |
| Award Date | 06/13/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT GSRDS, MVPS, AND BIOSWALES. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 01/22/2024) |
Sample Information
| Sample Taken Date | 06/12/2025 | Sample Unique Key | 89 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2025 |
| Sample type | Acceptance | A brief description of the sample | 6X12 PCC cylinders |
| The quantity of what the sample constitutes | 130 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | JAROEN | Last name of sampler or witnessed by | Young |
| Title of sampler | Assistant Structure Representative | Telephone number of sampler | |
| Laboratory sample identification | 25-297 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | United Rock Products Irwindale | Transportation Laboratory (TL) Number | GRSD-L6-01 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S72C447T14 |
|---|---|---|---|
| The truck number from where the sample was collected | 20476 | The batch plant ticket number from where the sample was collected | 194400 |
| Concrete batch plant | National Ready Mix Concrete Company | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | truck chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-06-12-89
DIME Test ID: 2025-06-12-89-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2025-07-07
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Robert Achuela
Date of test: 06/19/2025
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 6.02 in
Average diameter of cylinder 2: 6.01 in
Maximum load on cylinder 1: 130066 lb
Maximum load on cylinder 2: 122980 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Age of specimen: 7 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.46 in^2
Cross sectional area of cylinder 2: 28.37 in^2
Compressive strength of cylinder 1: 4570.1 psi
Compressive strength of cylinder 2: 4334.9 psi
Compressive strength (to nearest 10 psi): 4450 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/7/2025 ✔