Summary for Test 2025-06-18-88-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000889
DEA: 081M7404
EFIS: 0822000036
DIST-CO-RTE-PM08-SBD-210-1.2/1.6
Award Date03/12/2025
Closeout DateNot set
Work DescriptionJPCP (RSC), RDWY EXC, LCB RAPID SETTING, & HMA (TYPE A).
Location DescriptionSANBERNARDINO COUNTY IN UPLAND FROM 0.3 MILE WEST TO 0.1 MILE EAST OF MOUNTAIN AVENUE OVERCROSSING
QA Service Level1 (Verified on 01/13/2025)

Sample Information

Sample Taken Date06/18/2025 Sample Unique Key88
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/18/2025
Sample typeAcceptance A brief description of the sampleNative Subgrade
The quantity of what the sample constitutes31.2 kg From where was the sample collectedJob Site
First name of sampler or witnessed byGabriel Last name of sampler or witnessed byRamirez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedSR-210 WB Right Shoulder near Mountain Ave Overcrossing Bridge, Sta 399+72 - 405+00
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-06-18-88
DIME Test ID: 2025-06-18-88-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-07-07

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Gabriel Ramirez
Date of test: 06/18/2025
Gage No.: 36636
Test No.: 1
Nuclear By: Gabriel Ramirez
Non-Bias Plan No.: 4
Depth: 8"
Material No.: N/A
Material Type: Native Subgrade
Impact By: Gabriel Ramirez
Standard Count Density: 1734 g/cc
Count or Density 1: 746 g/cc
Count or Density 2: 608 g/cc
Count or Density 3: 722 g/cc
Standard Count Moisture: 643 g/cc
Moisture Count 1: 69 g/cc
Moisture Count 2: 78 g/cc
Moisture Count 3: 68 g/cc
Sum of Count or Density: 2076 g/cc
Average of Count or Density: 692 g/cc
Sum of Moisture Count: 215 g/cc
Average of Moisture Count: 72 g/cc
Count Ratio Density: 0.4
Count Ratio Moisture: 0.11
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%

Test was verified on 7/7/2025