Summary for Test 2025-06-12-55-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 1000363 DEA: 010H5504 EFIS: 0117000235 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-101-55.0/64.9 |
| Award Date | 08/15/2024 |
| Closeout Date | Not set |
| Work Description | HMA, RHMA, AND COLD PLANE ASPHALT CONCRETE PAVEMENT. |
| Location Description | MENDOCINO COUNTY NEAR LONGVALE FROM 2.6 MILES SOUTH OF ARNOLD BRIDGE OVERHEAD 10-179 TO 0.1 MILE NORTH OF LONG VALLEY CREEK BRIDGE 10-99 |
| QA Service Level | 1 (Verified on 07/08/2024) |
Sample Information
| Sample Taken Date | 06/12/2025 | Sample Unique Key | 55 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/17/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2 RHMA PG 64-16 JMF |
| The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Thomas | Last name of sampler or witnessed by | L |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Granite Ukiah | Transportation Laboratory (TL) Number | 778803 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2025-06-12-55
DIME Test ID: 2025-06-12-55-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2025-07-02
Test Results
Input Type: Measured
Tester's full name: Luis Maca
Date of test: 06/27/2025
Temperature: 25 C
Ball Penetration (P1): 9 mm
Final Dial reading (F1): 75 mm
Ball Penetration (P2): 7 mm
Final Dial reading (F2): 75 mm
Ball Penetration (P3): 6 mm
Final Dial reading (F3): 75 mm
Resilience 1: 34 %
Resilience 2: 32 %
Resilience 3: 31 %
Average Resilience: 32 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters): Resilience
Test was verified on 7/2/2025 ✔
