Summary for Test 2025-06-29-2-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
| Award Date | 06/22/2022 |
| Closeout Date | 12/02/2025 |
| Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2021) |
Sample Information
| Sample Taken Date | 06/29/2025 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/29/2025 | Sample type | Acceptance |
| A brief description of the sample | 3/4 HMA hot mix | The quantity of what the sample constitutes | Sampled @ 115T |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Tomas |
| Last name of sampler or witnessed by | Silva | Title of sampler | MREA |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | vulcan materials | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 6 |
| Sublot number | 3 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-06-29-2
DIME Test ID: 2025-06-29-2-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-07-01
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Tomas Silva
Date of test: 06/30/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3973.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 6153.9 g
Mass of HMA Sample prior to ignition: 2180.6 g
Mass Loss: 97.7 g
Mass of aggregate remaining after ignition: 2082.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.05 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.43 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2025 ✔