Summary for Test 2025-06-27-10-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1001288
DEA: 041X1004
EFIS: 0424000249
DIST-CO-RTE-PM04-SCL-9-4.0
Award DateNot set
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 06/05/2025)

Sample Information

Sample Taken Date06/27/2025 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/27/2025
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes2600g From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byVega
Title of samplerMREA Telephone number of sampler
Laboratory sample identificationSJ-062725-SG1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNative Material Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameHwy 9 "SC9" Line Rt NW Shoulder Emergency Job Slope Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedJobsite - Compacted Native Subgrade
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2025-06-27-10
DIME Test ID: 2025-06-27-10-1
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-06-27

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Fernando Vega
Date of test: 06/27/2025
Sum of Count or Density: 107850 g/cc
Average of Count or Density: 35950 g/cc
Sum of Moisture Count: 8633 g/cc
Average of Moisture Count: 2878 g/cc
Calculated Percent Relative Compaction: 96.1 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): Hwy 9 "SC9" Line Rt NW Shoulder Emergency Job Slope

Test was verified on 6/30/2025