Summary for Test 2025-06-16-6-8
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 1000259 DEA: 050N74V4 EFIS: 0522000043 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-9.2/9.7 |
| Award Date | 02/08/2024 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | FOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY AT MONTECITO FROM 0.2 MILE NORTH OF SHEFFIELD DRIVE UNDERCROSSING TO 0.3 MILE SOUTH OF SAN YSIDRO ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 04/15/2024) |
Sample Information
| Sample Taken Date | 06/16/2025 | Sample Unique Key | 6 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2025 |
| Sample type | Acceptance | A brief description of the sample | Skid Testing Request |
| The quantity of what the sample constitutes | Multiple Lanes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | EMILIANO | Last name of sampler or witnessed by | BERNTSEN |
| Title of sampler | Telephone number of sampler | 805-286-2394 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | GRANITE CONSTRUCTION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 51-0348, 51-0349, 51-0350 AND ADJACENT APPROACH SLABS, CRCP PAVEMENT | |
| Structure name | ROMERO CREEK BRIDGE, SAN YSIDRO CREEK BRIDGE, OAK CREEK BRIDGE AND ADJACENT CRCP PAVEMENTS | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | 05-SB-101 |
| Direction of Travel | North | Post Mile | 9.20 |
| Lanes to be Tested | Shoulder,On Ramp,Off Ramp,Lane #1,Lane #2,Lane #3 | Station |
Test Details
DIME Sample ID: 2025-06-16-6
DIME Test ID: 2025-06-16-6-8
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-06-27
Test Results
Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 06/27/2025
Air Temperature: 72 F
Tire Pressure: 24 psi
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGIN PROJECT
Edge used to measure position: RIGHT OF WALL
Project Stationing 1: 100+00 ft
Project Stationing 2: 125+00 ft
Project Stationing 3: 150+00 ft
Project Stationing 4: 175+00 ft
Project Stationing 5: 200+00 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 14 ft
Position for Stationing 2: 14 ft
Position for Stationing 3: 14 ft
Position for Stationing 4: 14 ft
Position for Stationing 5: 14 ft
Percent Grade for 1st Stationing: -1.0 %
Percent Grade for 2nd Stationing: -1.0 %
Percent Grade for 3rd Stationing: -1.0 %
Percent Grade for 4th Stationing: -1.0 %
Percent Grade for 5th Stationing: -1.0 %
Corrected Coefficients of Friction for Stationing 1: 0.33
Corrected Coefficients of Friction for Stationing 2: 0.32
Corrected Coefficients of Friction for Stationing 3: 0.33
Corrected Coefficients of Friction for Stationing 4: 0.34
Corrected Coefficients of Friction for Stationing 5: 0.33
Average Coefficient of Friction: 0.33
General comments (publicly viewable) (Max 1000 characters): MAINLINE BEGIN PROJECT TO SAN YSIDERO OFF RAMP
VISUALLY INSPECTED ENTIRE ROADWAY SURFACE AND TESTED THE 2500 FT AREA.
600FT-1000FT AVG .34
1000FT-1500FT AVG .34
1600-FT-2100FT AVG .33
2100FT-2500FT AVG .33
Test was verified on 6/27/2025 ✔