Summary for Test 2025-03-26-85-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 995125
DEA: 101E3004
EFIS: 1018000273
DIST-CO-RTE-PM10-SJ-5-32.5/49.8
Award Date01/12/2024
Closeout DateNot set
Work DescriptionREMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT.
Location DescriptionSAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE
QA Service Level1 (Verified on 09/26/2023)

Sample Information

Sample Taken Date03/26/2025 Sample Unique Key85
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/27/2025
Sample typeQuality Control A brief description of the sample1" Rock and Sand
The quantity of what the sample constitutes1 Bag From where was the sample collectedJob Site
First name of sampler or witnessed byRafael Last name of sampler or witnessed byDuenas
Title of samplerQC Technician Telephone number of sampler
Laboratory sample identificationMix HE4X4BM Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction - Volumetric Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-39-0002
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sampleSet 1
The plant number A detailed description of where the material sample was collectedBelt Cut
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberHE4X4BM Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-03-26-85
DIME Test ID: 2025-03-26-85-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-06-27

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Valentin Gonzalez
Date of test: 03/27/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 0
Sand reading (test 1): 0
Sand equivalent (test 1): 77
Sand equivalent before temperature correction: 77
Sand equivalent after temperature correction: 77
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/27/2025