Summary for Test 2025-06-17-99-3
Test performed: ASTM D5329-16Project Information
| Project Identifiers | Project ID: 210409 DEA: 08432724 EFIS: 0800020178 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-8-RIV-15-6.4/9.7 |
| Award Date | 05/01/2023 |
| Closeout Date | Not set |
| Work Description | Collector/distributor system, new on-ramps, bridges, RW, sound walls, drainage, signal and lighting, signage, freeway widening |
| Location Description | I-15 from Winchester Road to I-215 Junction in Temecula |
| QA Service Level | 2 (Verified on 06/24/2021) |
Sample Information
| Sample Taken Date | 06/17/2025 | Sample Unique Key | 99 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/19/2025 |
| Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jason | Last name of sampler or witnessed by | Buskoy |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | All American Asphalt Perris | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2025-06-17-99
DIME Test ID: 2025-06-17-99-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2025-07-17
Test Results
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 06/26/2025
Temperature: 25 C
Ball Penetration (P1): 2 mm
Final Dial reading (F1): 72 mm
Ball Penetration (P2): 0 mm
Final Dial reading (F2): 68 mm
Ball Penetration (P3): 3 mm
Final Dial reading (F3): 73 mm
Resilience 1: 30 %
Resilience 2: 32 %
Resilience 3: 30 %
Average Resilience: 31 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/17/2025 ✔
