Summary for Test 2025-06-17-101-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000636 DEA: 024H03U4 EFIS: 0224000026 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-12.9/20.0,20.6/21.0 |
| Award Date | 12/20/2024 |
| Closeout Date | 02/26/2026 |
| Work Description | HMA OVERLAY. |
| Location Description | PLUMAS COUNTY IN AND NEAR GREENVILLE FROM 0.8 MILE SOUTH OF DIXIE CANYON ROAD TO WOLF CREEK BRIDGE AND FROM MILL STREET TO 0.4 MILE NORTH OF HILLSIDE DRIVE |
| QA Service Level | 1 (Verified on 09/24/2024) |
Sample Information
| Sample Taken Date | 06/17/2025 | Sample Unique Key | 101 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/18/2025 | Sample type | Production Start-Up |
| A brief description of the sample | 1 Bag RAP | The quantity of what the sample constitutes | Production Start Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Dawn |
| Last name of sampler or witnessed by | Sloatermen | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D79907 | |
| Linked DIME Sample ID | 857988 | The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Ward Lake Plant (Litchfield, CA) |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Ward Lake Plant, Litchfield, CA |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-06-17-101
DIME Test ID: 2025-06-17-101-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-26
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean Mcwithey
Date of test: 06/23/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3115.1 g
Mass of the specimen and specimen basket assembly prior to ignition: 4764.8 g
Mass of HMA Sample prior to ignition: 1649.7 g
Mass Loss: 112.0 g
Mass of aggregate remaining after ignition: 1537.7 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.61 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.61%
Pbr≈5.13
Test was verified on 6/26/2025 ✔
