Summary for Test 2025-01-07-53-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
| Award Date | 11/06/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
| QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
| Sample Taken Date | 01/07/2025 | Sample Unique Key | 53 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/07/2025 |
| Sample type | Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 38 sq. yd approximate | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
| Title of sampler | MREA | Telephone number of sampler | (626) 234-5816 |
| Laboratory sample identification | 25-0029 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CA Rasmussen Inc. | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at subgrade. | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-01-07-53
DIME Test ID: 2025-01-07-53-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-06-25
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 01/07/2025
Sum of Count or Density: 5.73 g/cc
Average of Count or Density: 1.91 g/cc
Sum of Moisture Count: 0.84 g/cc
Average of Moisture Count: 0.28 g/cc
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/25/2025 ✔
