Summary for Test 2025-03-22-13-1

Test performed: CTM 524-March 2013

Project Information

Project IdentifiersProject ID: 994582
DEA: 073203U4
EFIS: 0722000071
DIST-CO-RTE-PM07-LA-91,605-R16.6/R16.8,R0.0/R10.4
Award Date06/20/2023
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT.
Location DescriptionLOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING
QA Service Level1 (Verified on 07/12/2023)

Sample Information

Sample Taken Date03/22/2025 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/23/2025
Sample typeAcceptance A brief description of the sampleRapid set concrete beams
The quantity of what the sample constitutes1400 CY approximate From where was the sample collectedJob Site
First name of sampler or witnessed byAndrew Last name of sampler or witnessed bySquires
Title of samplerG3 Field Technician Telephone number of sampler909-771-6960
Laboratory sample identification25-0844 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVanguard Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberHE4x12BM
The truck number from where the sample was collected1 The batch plant ticket number from where the sample was collectedNA
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete Truck Chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-03-22-13
DIME Test ID: 2025-03-22-13-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2025-06-25

Test Results


Number of specimens: 3
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 04/01/2025
Identification number: 25-0844
Width of specimen: 6.0625 inch
Width of specimen 2: 6.0625 inch
Width of specimen 3: 6.0625 inch
Depth of specimen: 6.0625 inch
Depth of specimen 2: 6 inch
Depth of specimen 3: 6.0625 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Span length of specimen 3: 18 inch
Maximum load applied: 11812 lb
Maximum load applied 2: 11189 lb
Maximum load applied 3: 11146 lb
Curing history and apparent moisture condition of the specimen: Damp
If specimen was capped, ground or if leather shims were used: No
Defects in specimen, including numbers of beams discarded during test: No
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 1000 psi
Modulus of rupture 2: 970 psi
Modulus of rupture 3: 950 psi
Modulus of rupture average: 970 psi
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/25/2025