Summary for Test 2025-03-10-87-2
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 1000539 DEA: 044K3004 EFIS: 0417000293 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-22.1/R23.0 |
| Award Date | 11/05/2024 |
| Closeout Date | 05/25/2026 |
| Work Description | CONSTRUCT CONCRETE BARRIER AND INSTALL DRAINAGE SYSTEM. |
| Location Description | SOLANO COUNTY FROM 1.2 MILES EAST OF NORTH TEXAS STREET OVERCROSSING IN FAIRFIELD TO 0.1 MILE WEST OF CHERRY GLEN ROAD OVERCROSSING IN VACAVILLE |
| QA Service Level | 1 (Verified on 08/29/2024) |
Sample Information
| Sample Taken Date | 03/10/2025 | Sample Unique Key | 87 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/10/2025 | Sample type | Quality Control |
| A brief description of the sample | Concrete | The quantity of what the sample constitutes | 100 cy |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Esteban |
| Last name of sampler or witnessed by | Irizarry | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Cemex | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1615674 |
|---|---|---|---|
| The truck number from where the sample was collected | 10077032 | The batch plant ticket number from where the sample was collected | 41258155 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Concrete Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-03-10-87
DIME Test ID: 2025-03-10-87-2
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2025-06-25
Test Results
Input Type: Calculated
Tester's full name: Esteban Irizarry
Date of test: 03/10/2025
Temperature: 69 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/25/2025 ✔
