Summary for Test 2025-05-12-76-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000784 DEA: 07356504 EFIS: 0719000023 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-126-R14.6/R34.5 |
| Award Date | 01/23/2025 |
| Closeout Date | Not set |
| Work Description | INSTALL DPP INFILTRATION AREA AND HOT MIX ASPHALT. |
| Location Description | VENTURA COUNTY IN AND NEAR FILLMORE AT VARIOUS LOCATIONS FROM HALLOCK DRIVE TO 0.1 MILE WEST OF THE LOS ANGELES COUNTY LINE |
| QA Service Level | 1 (Verified on 11/11/2024) |
Sample Information
| Sample Taken Date | 05/12/2025 | Sample Unique Key | 76 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/12/2025 |
| Sample type | Acceptance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 65 sq. yd | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
| Title of sampler | MREA | Telephone number of sampler | (213) 358-1518 |
| Laboratory sample identification | 25-1555 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | ACCU | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at Aggregate Base | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-05-12-76
DIME Test ID: 2025-05-12-76-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-06-25
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 05/12/2025
Sum of Count or Density: 6.18 g/cc
Average of Count or Density: 2.06 g/cc
Sum of Moisture Count: 0.4 g/cc
Average of Moisture Count: 0.13 g/cc
Calculated Percent Relative Compaction: 97.2 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/25/2025 ✔
