Summary for Test 2025-05-22-51-8

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 1000698
DEA: 024H0704
EFIS: 0218000074
DIST-CO-RTE-PM02-LAS-139-0.74/11.0
Award Date01/29/2025
Closeout Date09/25/2026
Work DescriptionPLACE HMA (TYPE A), TRAFFIC CONTROL SYSTEM, TRAFFIC STRIPE, RDWY EXC.
Location DescriptionLASSEN COUNTY NEAR SUSANVILLE FROM 0.1 MILE NORTH OF CHESTNUT STREET TO 2.6 MILES SOUTH OF HORSE LAKE ROAD
QA Service Level1 (Verified on 10/24/2024)

Sample Information

Sample Taken Date05/22/2025 Sample Unique Key51
Date that the sample was received by the laboratory/organization performing the testing06/02/2025 Sample typeQuality Assurance
A brief description of the samplePG 58-34 The quantity of what the sample constitutes2 Cans
From where was the sample collectedJob Site First name of sampler or witnessed byJoe
Last name of sampler or witnessed byDelgado Title of samplerConsultant
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameHot Creek Word Lake
Transportation Laboratory (TL) Number867337 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierAlbina Asphalt (Klamath Falls Plant) - Klamath Falls OR MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2025-05-22-51
DIME Test ID: 2025-05-22-51-8
Testing Lab: Atlas - Denver
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-06-25

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Atlas
Date of test: 06/13/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 205.625 grams
Mass of container #2 before test (m2i): 209.159 grams
Mass of container #1 after test (m1f): 205.408 grams
Mass of container #2 after test (m2f): 208.947 grams
Mass of empty container #1: 170.554 grams
Mass of empty container #2: 174.357 grams
Mass correction factor: 0.030
Average mass change: -0.584 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change

Test was verified on 6/25/2025 ✔