Summary for Test 2025-06-18-38-4
Test performed: CTM 301-March 2000Project Information
| Project Identifiers | Project ID: 1000682 DEA: 09379104 EFIS: 0919000005 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-91.6/100.8 |
| Award Date | 02/20/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS. |
| Location Description | INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168 |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 06/18/2025 | Sample Unique Key | 38 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/19/2025 | Sample type | Acceptance |
| A brief description of the sample | Class II Agg Base | The quantity of what the sample constitutes | 1 Bag of Base |
| From where was the sample collected | Source | First name of sampler or witnessed by | Dylan |
| Last name of sampler or witnessed by | Carapazza | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | 4644 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Grinding Rock - Independence | |
| Transportation Laboratory (TL) Number | AB-01 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 00-00-0000 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile at Pit | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-06-18-38
DIME Test ID: 2025-06-18-38-4
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2025-06-20
Test Results
How will the R value be determined?: By expansion pressure
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 06/20/2025
As Received Gradation, Percent Passing 3 in. sieve: no data
As Received Gradation, Percent Passing 2 1/2 in. sieve: no data
As Received Gradation, Percent Passing 2 in. sieve: no data
As Received Gradation, Percent Passing 1 1/2 in. sieve: no data
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 99 %
As Received Gradation, Percent Passing 1/2 in. sieve: 77 %
As Received Gradation, Percent Passing 3/8 in. sieve: 64 %
As Received Gradation, Percent Passing #4 sieve: 45 %
As Received Gradation, Percent Passing #8 sieve: 30 %
As Received Gradation, Percent Passing #16 sieve: 21 %
As Received Gradation, Percent Passing #30 sieve: 16 %
As Received Gradation, Percent Passing #50 sieve: 13 %
As Received Gradation, Percent Passing #100 sieve: 10 %
As Received Gradation, Percent Passing #200 sieve: 6.9 %
As Used Gradation, Percent Passing 3 in. sieve: no data
As Used Gradation, Percent Passing 2 1/2 in. sieve: no data
As Used Gradation, Percent Passing 2 in. sieve: no data
As Used Gradation, Percent Passing 1 1/2 in. sieve: no data
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 78 %
As Used Gradation, Percent Passing 3/8 in. sieve: 65 %
As Used Gradation, Percent Passing #4 sieve: 46 %
As Used Gradation, Percent Passing #8 sieve: 30 %
As Used Gradation, Percent Passing #16 sieve: 21 %
As Used Gradation, Percent Passing #30 sieve: 16 %
As Used Gradation, Percent Passing #50 sieve: 13 %
As Used Gradation, Percent Passing #100 sieve: 10 %
As Used Gradation, Percent Passing #200 sieve: 7 %
R value: 83
General comments (publicly viewable) (Max 1000 characters): AB-01
Test was verified on 6/20/2025 ✔