Summary for Test 2025-06-09-75-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000029 DEA: 101K4304 EFIS: 1021000096 |
|---|---|
| DIST-CO-RTE-PM | 10-MER-165-16.5/26.8 |
| Award Date | 06/26/2024 |
| Closeout Date | Not set |
| Work Description | RHMA (GAP GRADED) AND FULL DEPTH RECYCLING- CEMENT. |
| Location Description | MERCED COUNTY NEAR LOS BANOS FROM 1.5 MILES NORTH OF WOLFSEN ROAD TO 0.1 MILE SOUTH OF ROUTE 140 |
| QA Service Level | 1 (Verified on 01/17/2024) |
Sample Information
| Sample Taken Date | 06/09/2025 | Sample Unique Key | 75 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/10/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2 RHMA PG 64-16 |
| The quantity of what the sample constitutes | 8 Boxes | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Timothy | Last name of sampler or witnessed by | Trefz |
| Title of sampler | Lab Technician | Telephone number of sampler | |
| Laboratory sample identification | 25-H-125 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Santa Fe Aggregate Winton | Transportation Laboratory (TL) Number | 1K43205 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 2 |
| Sublot number | 5 | HMA Mix Number | 25J07 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-06-09-75
DIME Test ID: 2025-06-09-75-2
Testing Lab: CT D10 - District 10 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-19
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Hans Camenzind
Date of test: 06/11/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1593.2 g
Mass Loss: 119.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.53 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/19/2025 ✔
