Summary for Test 2025-05-14-70-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000636 DEA: 024H03U4 EFIS: 0224000026 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-12.9/20.0,20.6/21.0 |
| Award Date | 12/20/2024 |
| Closeout Date | 02/26/2026 |
| Work Description | HMA OVERLAY. |
| Location Description | PLUMAS COUNTY IN AND NEAR GREENVILLE FROM 0.8 MILE SOUTH OF DIXIE CANYON ROAD TO WOLF CREEK BRIDGE AND FROM MILL STREET TO 0.4 MILE NORTH OF HILLSIDE DRIVE |
| QA Service Level | 1 (Verified on 09/24/2024) |
Sample Information
| Sample Taken Date | 05/14/2025 | Sample Unique Key | 70 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/14/2025 | Sample type | Production Start-Up |
| A brief description of the sample | 1 bag of Fine RAP | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Andrea |
| Last name of sampler or witnessed by | Sloaterman | Title of sampler | TET C |
| Telephone number of sampler | Laboratory sample identification | D79878 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Hat Creek Construction & Materials — Ward Lake Plant (Litchfield, CA) | |
| Transportation Laboratory (TL) Number | 857978 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Ward Lake Plant, Litchfield, CA |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-05-14-70
DIME Test ID: 2025-05-14-70-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-17
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Dacota Mei
Date of test: 06/17/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3038.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 4655.8 g
Mass of HMA Sample prior to ignition: 1617.1 g
Mass Loss: 125.2 g
Mass of aggregate remaining after ignition: 1491.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.55 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=7.56%,
Pbr≈6.41%
Test was verified on 6/17/2025 ✔
