Summary for Test 2025-04-24-1-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 994309 DEA: 033H5404 EFIS: 0318000012 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-70-46.0/47.0 |
| Award Date | 02/10/2023 |
| Closeout Date | Not set |
| Work Description | RAISE ALIGNMENT, PLACE HMA, STRUCTURAL CONCRETE & BRIDGE RAIL. |
| Location Description | BUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OF SHADY REST AREA |
| QA Service Level | 1 (Verified on 10/04/2022) |
Sample Information
| Sample Taken Date | 04/24/2025 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/24/2025 |
| Sample type | Acceptance | A brief description of the sample | Skid Testing Request |
| The quantity of what the sample constitutes | Multiple Lanes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jason | Last name of sampler or witnessed by | Charmbury |
| Title of sampler | ASR | Telephone number of sampler | 530-320-6459 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Dees Burke | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 12-0207 & 12E0008 & 12E0009 | |
| Structure name | Bear Creek Bridge, Wall #1, Wall #2 | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | 03-BUT-70 |
| Direction of Travel | East | Post Mile | 46.40 |
| Lanes to be Tested | Shoulder,Lane #1,Lane #2 | Station |
Test Details
DIME Sample ID: 2025-04-24-1
DIME Test ID: 2025-04-24-1-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-06-16
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 06/16/2025
Air Temperature: 60
Tire Pressure: 24
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN SLAB
Edge used to measure position: LEFT OF EDGE
Reference Distance 1: 2
Reference Distance 2: 4
Reference Distance 3: 6
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 1
Position for Stationing 2: 1
Position for Stationing 3: 1
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.41
Corrected Coefficients of Friction for Stationing 2: 0.41
Corrected Coefficients of Friction for Stationing 3: 0.41
Average Coefficient of Friction: 0.41
General comments (publicly viewable) (Max 1000 characters): Bear Creek Bridge/TRIAL SLAB
Test was verified on 6/16/2025 ✔