Summary for Test 2025-05-21-54-8
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 994247 DEA: 051H8604 EFIS: 0517000002 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-46.2/R52.3 |
| Award Date | 02/01/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PVMT, PLACE HMA, RHMA-G, HMA-0, REPLACE MEDIAN BARRIER. |
| Location Description | SANTA BARBARA COUNTY NEAR GAVIOTA FROM 0.1 MILE NORTH OF GAVIOTA BEACH STATE PARK TO OLD COAST HIGHWAY |
| QA Service Level | 1 (Verified on 09/23/2022) |
Sample Information
| Sample Taken Date | 05/21/2025 | Sample Unique Key | 54 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/27/2025 |
| Sample type | Quality Assurance | A brief description of the sample | PG 58-34M |
| The quantity of what the sample constitutes | 2 cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Nathaniel | Last name of sampler or witnessed by | Guzman |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Cal Portland Garey | Transportation Laboratory (TL) Number | 250521B |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
|---|---|---|---|
| Modified | Yes | Lot number | 1 |
| Sublot number | 1 | Tank number | |
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2025-05-21-54
DIME Test ID: 2025-05-21-54-8
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-06-16
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: WSP
Date of test: 06/12/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.794 grams
Mass of container #2 before test (m2i): 202.570 grams
Mass of container #1 after test (m1f): 203.616 grams
Mass of container #2 after test (m2f): 202.389 grams
Mass of empty container #1: 168.919 grams
Mass of empty container #2: 167.702 grams
Mass correction factor: 0.006
Average mass change: -0.509 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 6/16/2025 ✔
