Summary for Test 2025-05-08-61-9

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 214627
DEA: 05344904
EFIS: 0500000505
DIST-CO-RTE-PM05-SBT-156-3/R8.2
Award Date05/19/2022
Closeout DateNot set
Work DescriptionSAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE.
Location DescriptionSAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156
QA Service Level1 (Verified on 01/14/2020)

Sample Information

Sample Taken Date05/08/2025 Sample Unique Key61
Date that the sample was received by the laboratory/organization performing the testing05/19/2025 Sample typeInformational
A brief description of the samplePG 64-28M The quantity of what the sample constitutes1 of 2 Cans
From where was the sample collectedJob Site First name of sampler or witnessed byA
Last name of sampler or witnessed byRomiza Title of samplerTET
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert Vernalis
Transportation Laboratory (TL) Number0508252 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedNo Lot number1
Sublot number8 Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2025-05-08-61
DIME Test ID: 2025-05-08-61-9
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-02-04

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: WSP
Date of test: 06/11/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 204.689 grams
Mass of container #2 before test (m2i): 205.593 grams
Mass of container #1 after test (m1f): 204.534 grams
Mass of container #2 after test (m2f): 205.442 grams
Mass of empty container #1: 169.463 grams
Mass of empty container #2: 170.514 grams
Mass correction factor: 0.006
Average mass change: -0.429 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change

Test was verified on 2/4/2026 ✔