Summary for Test 2025-06-06-28-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 994582 DEA: 073203U4 EFIS: 0722000071 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-91,605-R16.6/R16.8,R0.0/R10.4 |
| Award Date | 06/20/2023 |
| Closeout Date | Not set |
| Work Description | PLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT. |
| Location Description | LOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/12/2023) |
Sample Information
| Sample Taken Date | 06/06/2025 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/06/2025 |
| Sample type | Quality Assurance | A brief description of the sample | Aggregate Base |
| The quantity of what the sample constitutes | 36 SY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Rigoberto | Last name of sampler or witnessed by | Arroyo |
| Title of sampler | Materials Tester | Telephone number of sampler | 7605743880 |
| Laboratory sample identification | 25-1849 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | NB-605 Spring st. On-Ramp ADL Ramp #1 | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Aggregate Base | The fabricator/manufacturer designation for the sample | Compaction Testing |
| The plant number | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled | Jobsite | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-06-06-28
DIME Test ID: 2025-06-06-28-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2025-06-12
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Rigoberto Arroyo
Date of test: 06/06/2025
In-place wet density: 2.10
Highest adjust wet density: 2.18
% Moisture: 6.1 %
Optimum Moisture: 7.6 %
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/12/2025 ✔
