Summary for Test 2025-06-09-54-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
| Award Date | 04/04/2024 |
| Closeout Date | Not set |
| Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
| QA Service Level | 1 (Verified on 10/03/2023) |
Sample Information
| Sample Taken Date | 06/09/2025 | Sample Unique Key | 54 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/10/2025 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Zubieta | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | All American Asphalt-Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2025-06-09-54
DIME Test ID: 2025-06-09-54-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-06-24
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 06/12/2025
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.752 grams
Mass of empty container #2: 172.226 grams
Mass of container #1 before test (m1i): 205.865 grams
Mass of container #2 before test (m2i): 207.478 grams
Mass of container #1 after test (m1f): 205.788 grams
Mass of container #2 after test (m2f): 207.401 grams
Average mass change: -0.219 percent
General comments (publicly viewable) (Max 1000 characters): -0.219 + 0.006 = -0.213
Test was verified on 6/24/2025 ✔
