Summary for Test 2025-06-05-46-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 994574 DEA: 050C7334 EFIS: 0518000116 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR-1-10.5/13.4 |
| Award Date | 06/29/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT OVERCROSSING AND AUXILIARY LANE/ Replace Capitola Ave OC + RWs and SWs |
| Location Description | SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM STATE PARK DRIVE OVERCROSSING TO 0.2 MILE NORTH OF BAY AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 04/13/2023) |
Sample Information
| Sample Taken Date | 06/05/2025 | Sample Unique Key | 46 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/06/2025 |
| Sample type | Quality Control | A brief description of the sample | HRC Couplers |
| The quantity of what the sample constitutes | 8 HRC Coupler Assemblies | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | John | Last name of sampler or witnessed by | Hiner |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 291299 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Associated Rebar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC/Nucor |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #5 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 79013707 | Rebar Heat Number(s) | 4148669, 3500042213 |
| Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2025-06-05-46
DIME Test ID: 2025-06-05-46-1
Testing Lab: Construction Testing Services
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2025-06-11
Test Results
Number of Samples: 8
Input Type: Calculated
Tester's full name: Jon Garland
Date of test: 06/10/2025
UTM: NA
Temperature: 68 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 5 | 0.31 | 29060 | 93742 | Pass | Jon Garland |
| 2 | 2 | 1 | 5 | 0.31 | 28940 | 93355 | Pass | Jon Garland |
| 3 | 3 | 1 | 5 | 0.31 | 29020 | 93613 | Pass | Jon Garland |
| 4 | 4 | 1 | 5 | 0.31 | 29020 | 93613 | Pass | Jon Garland |
| 5 | 1 | 4 | 5 | 0.31 | 29020 | 93613 | Pass | Jon Garland |
| 6 | 2 | 4 | 5 | 0.31 | 28840 | 93032 | Pass | Jon Garland |
| 7 | 3 | 4 | 5 | 0.31 | 28940 | 93355 | Pass | Jon Garland |
| 8 | 4 | 4 | 5 | 0.31 | 28880 | 93161 | Pass | Jon Garland |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/11/2025 ✔
