Summary for Test 2025-04-22-97-9

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 995239
DEA: 060W9104
EFIS: 0618000011
DIST-CO-RTE-PM06-TUL-99-27.6/30.6
Award Date09/17/2024
Closeout DateNot set
Work DescriptionHMA, RHMA-G, JOINTED PLAIN CONC PVMT (RSC) AND STBB (TYPE M).
Location DescriptionTULARE COUNTY IN AND NEAR TULARE FROM PAIGE AVENUE OVERCROSSING TO PROSPERITY AVENUE OVERCROSSING.
QA Service Level1 (Verified on 10/14/2024)

Sample Information

Sample Taken Date04/22/2025 Sample Unique Key97
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/19/2025
Sample typeProduction Start-Up A brief description of the sample1 can PG 64-16 Binder
The quantity of what the sample constitutesPSUE From where was the sample collectedSource
First name of sampler or witnessed byMartika Last name of sampler or witnessed byHall
Title of samplerJET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMMV - Visalia Transportation Laboratory (TL) NumberC057153
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierSan Joaquin Refinery - Bakersfield CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2025-04-22-97
DIME Test ID: 2025-04-22-97-9
Testing Lab: WSP USA - Phoenix
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-06-11

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Brian Waterbury
Date of test: 06/11/2025
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 192.032 grams
Mass of container #2 before test (m2i): 202.447 grams
Mass of container #1 after test (m1f): 192.025 grams
Mass of container #2 after test (m2f): 202.440 grams
Mass of empty container #1: 157.110 grams
Mass of empty container #2: 167.742 grams
Mass correction factor: 0.006
Average mass change: -0.014 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change

Test was verified on 6/11/2025