Summary for Test 2023-01-15-1-2
Test performed: AASHTO T336-15
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
| Project Identifiers | Project ID: 993529 DEA: 11430514 EFIS: 1119000008 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-15-R31.3/R37.1 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CRCP, FIBER OPTIC CABLE, AND HMA. |
| Location Description | SAN DIEGO COUNTY IN AND NEAR ESCONDIDO FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATION TO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 02/07/2022) |
Sample Information
| Sample Taken Date | 01/15/2023 | Sample Unique Key | 1 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/26/2023 |
| Sample type | Quality Control | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 2 | From where was the sample collected | Source |
| First name of sampler or witnessed by | James | Last name of sampler or witnessed by | Rogers |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | RD2271-CA-117 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Security Paving | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-22-PCC-313 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 0 | |
| Concrete batch plant | Security Paving | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | Onsite Batch Plant | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-01-15-1
DIME Test ID: 2023-01-15-1-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete
Test Release Date: 2025-06-10
Test Results
Input Type: Calculated
Tester's full name: Mario Salazar
Date of test: 02/22/2023
Average CTE: 0.000008668 mm/mm/°C
Average CTE: 4.815 in/in/°F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/10/2025 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
