Summary for Test 2025-06-03-60-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 994582
DEA: 073203U4
EFIS: 0722000071
DIST-CO-RTE-PM07-LA-91,605-R16.6/R16.8,R0.0/R10.4
Award Date06/20/2023
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT AND HIGH FRICTION SURFACE TREATMENT.
Location DescriptionLOS ANGELES COUNTY ON ROUTE 605 FROM 0.2 MILE NORTH OF KATELLA AVENUE UNDECROSSING TO 0.1 MILE NORTH OF TELEGRAPH ROAD UNDERCROSSING AND ON ROUTE 91 FROM 0.4 MILE WEST OF ROUTE 605 UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 605 UNDERCROSSING
QA Service Level1 (Verified on 07/12/2023)

Sample Information

Sample Taken Date06/03/2025 Sample Unique Key60
Date that the sample was received by the laboratory/organization performing the testing06/03/2025 Sample typeQuality Assurance
A brief description of the sampleSubgrade The quantity of what the sample constitutes11 SY
From where was the sample collectedJob Site First name of sampler or witnessed byMike
Last name of sampler or witnessed byDillion Title of samplerMaterials Tester
Telephone number of sampler9097018239 Laboratory sample identification25-1763
Linked DIME Sample ID The fabricator/manufacturer/facility nameN/A
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameSB 605 FWY Off Ramp at Firestone Blvd. Curb Ramp #16
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)N/A
The fabricator's/manufacturer's product name for the sampleSubgrade The fabricator/manufacturer designation for the sampleCompaction testing
The plant number A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-06-03-60
DIME Test ID: 2025-06-03-60-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-06-06

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Mike Dillon
Date of test: 06/03/2025
Gage No.: 3704
Test No.: 2
Nuclear By: Mike Dillon
Non-Bias Plan No.: 1
Depth: 4"
Material No.: native
Material Type: Subgrade
Impact By: Mike Dillon
Standard Count Density: 26557 g/cc
Count or Density 1: 45463 g/cc
Count or Density 2: 47667 g/cc
Count or Density 3: 44011 g/cc
Standard Count Moisture: 9080 g/cc
Moisture Count 1: 1740 g/cc
Moisture Count 2: 1831 g/cc
Moisture Count 3: 1380 g/cc
Sum of Count or Density: 137141 g/cc
Average of Count or Density: 45713.67 g/cc
Sum of Moisture Count: 4951 g/cc
Average of Moisture Count: 1650.33 g/cc
Calculated Percent Relative Compaction: 93.8 %
Reported Percent Relative Compaction: 94 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/6/2025 ✔