Summary for Test 2025-06-04-24-3
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
| Award Date | 10/22/2021 |
| Closeout Date | 05/29/2026 |
| Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
| Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/03/2019) |
Sample Information
| Sample Taken Date | 06/04/2025 | Sample Unique Key | 24 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/04/2025 | Sample type | Acceptance |
| A brief description of the sample | 1/2" Coldfeed & RAP | The quantity of what the sample constitutes | 750 Tons |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jerid |
| Last name of sampler or witnessed by | Kupelian | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | 1155 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Fisher Sand and Gravel | |
| Transportation Laboratory (TL) Number | CF-F67 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 00-00-0000 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Sample Device at Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-06-04-24
DIME Test ID: 2025-06-04-24-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2025-06-05
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: Yes
Input Type: Measured
Tester's full name: Jerid Kupelian
Date of test: 06/04/2025
| Cumulative Mass Retained | Correction Factor | Cumulative Percent Passing | ||||
|---|---|---|---|---|---|---|
| 1116.0 grams | ||||||
| 0.0 grams | 0.0 % | 100 % | ||||
| 0.0 grams | 0.0 % | 100 % | ||||
| 0.0 grams | 0.0 % | 100 % | ||||
| 0.0 grams | 0.0 % | 100 % | ||||
| 0.0 grams | 0.0 % | 100 % | ||||
| 0.0 grams | -0.3 % | 100 % | ||||
| 105.5 grams | -4.9 % | 86 % | ||||
| 283.9 grams | -3.8 % | 71 % | ||||
| 472.3 grams | -1.6 % | 56 % | ||||
| 629.2 grams | -0.3 % | 43 % | ||||
| 772.9 grams | -0.9 % | 30 % | ||||
| 905.8 grams | -0.6 % | 18 % | ||||
| 1003.8 grams | -0.4 % | 9.7 % | ||||
| 1058.0 grams | ||||||
General comments (publicly viewable) (Max 1000 characters): CF-F67 RAP
Test was verified on 6/5/2025 ✔
