Summary for Test 2025-05-29-52-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000564 DEA: 033J7504 EFIS: 0322000312 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-49-4.6/4.9 |
| Award Date | 10/30/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT SIDEWALKS, CURB RAMPS, AND COLD PLANE AC PAVEMENT. |
| Location Description | PLACER COUNTY NEAR AUBURN FROM EDGEWOOD ROAD TO SUMMER RIDGE DRIVE |
| QA Service Level | 1 (Verified on 09/17/2024) |
Sample Information
| Sample Taken Date | 05/29/2025 | Sample Unique Key | 52 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/02/2025 |
| Sample type | Quality Assurance | A brief description of the sample | 4 Boxes |
| The quantity of what the sample constitutes | 3/4" HMA w/ 15% RAP | From where was the sample collected | Source |
| First name of sampler or witnessed by | Teichert (David) | Last name of sampler or witnessed by | QC (Drane) |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Daily 25-059 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert Perkins | Transportation Laboratory (TL) Number | C765568 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-05-29-52
DIME Test ID: 2025-05-29-52-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-04
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Joshua Wilson
Date of test: 06/04/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2219.5 g
Mass Loss: 132.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.45 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.02 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.52 %
General comments (publicly viewable) (Max 1000 characters): L1
OBC 4.8%
Test was verified on 6/4/2025 ✔
