Summary for Test 2025-05-21-14-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994859
DEA: 021H5904
EFIS: 0216000025
DIST-CO-RTE-PM02-SIS-96-43.5,57.0
Award Date08/07/2023
Closeout DateNot set
Work DescriptionREPLACE CULVERTS WITH BRIDGES, STREAMBED RESTORATION, & LANDSCAPING.
Location DescriptionSISKIYOU COUNTY AT AND NEAR HAPPY CAMP AT 0.8 MILE WEST OF GORDON\\'S FERRY ROAD AND AT PORTUGUESE CREEK
QA Service Level1 (Verified on 08/10/2023)

Sample Information

Sample Taken Date05/21/2025 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing05/21/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byNicolas Last name of sampler or witnessed byJimenez
Title of samplerCT STRUCTURE REP Telephone number of sampler5306055869
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameJF Shea Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier02-0209
Structure namePortuguese Creek Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE02-Sis-96
Direction of TravelWest Post Mile57.00
Lanes to be TestedShoulder,Lane #1,Lane #2 Station

Test Details

DIME Sample ID: 2025-05-21-14
DIME Test ID: 2025-05-21-14-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-06-04

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 06/03/2025
Air Temperature: 70
Tire Pressure: 25
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Construction Edge
Reference Distance 1: 13
Reference Distance 2: 16
Reference Distance 3: 19
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 8
Position for Stationing 2: 8
Position for Stationing 3: 8
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.37
Corrected Coefficients of Friction for Stationing 2: 0.37
Corrected Coefficients of Friction for Stationing 3: 0.37
Average Coefficient of Friction: 0.37
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/4/2025