Summary for Test 2025-03-24-95-5
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1000286 DEA: 070W7004 EFIS: 0723000032 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-405-44.7/48.64 |
| Award Date | 06/19/2024 |
| Closeout Date | 12/24/2025 |
| Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), & GRIND EXIST CONC PAVEMENT. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES FROM NORDHOFF STREET UNDERCROSSING TO ROUTE 5/405 SEPARATION |
| QA Service Level | 1 (Verified on 09/16/2024) |
Sample Information
| Sample Taken Date | 03/24/2025 | Sample Unique Key | 95 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/14/2025 | Sample type | Production Start-Up |
| A brief description of the sample | 3/4" RHMA G SP 0.5% LAS | The quantity of what the sample constitutes | 8 BX RHMA 4 BG CMB AGG 4 QT RBR BLND 2 QT PG64-16 2 QT LAS 1 BG EA HN & CRM RBR |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | JOHN |
| Last name of sampler or witnessed by | MEJIA | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0291G-25 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Irwindale | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 226108M IRW LTR | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-03-24-95
DIME Test ID: 2025-03-24-95-5
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-06-02
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Antonio Torres
Date of test: 05/16/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2188.0 g
Mass Loss: 170.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.43 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.22 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/2/2025 ✔
