Summary for Test 2025-05-21-68-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 1000369 DEA: 09378804 EFIS: 0919000002 |
|---|---|
| DIST-CO-RTE-PM | 09-MNO-395-R9.8/R12.6 |
| Award Date | 08/29/2024 |
| Closeout Date | Not set |
| Work Description | PLACE HMA AND ASPHALT BASE, RECYCLE PAVEMENT AND MODIFY ELECTRICAL. |
| Location Description | MONO COUNTY NEAR TOM\\\\\\\\\\\\\\\\'S PLACE FROM 0.5 MILE NORTH OF LOWER ROCK CREEK ROAD TO 1.3 MILES SOUTH OF SOUTH LANDING OVERCROSSING |
| QA Service Level | 1 (Verified on 09/02/2024) |
Sample Information
| Sample Taken Date | 05/21/2025 | Sample Unique Key | 68 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/28/2025 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Granite QC |
| Last name of sampler or witnessed by | Granite QC | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Lockwood Hot Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2025-05-21-68
DIME Test ID: 2025-05-21-68-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2025-06-02
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 05/30/2025
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.751 grams
Mass of empty container #2: 172.223 grams
Mass of container #1 before test (m1i): 205.811 grams
Mass of container #2 before test (m2i): 207.296 grams
Mass of container #1 after test (m1f): 205.783 grams
Mass of container #2 after test (m2f): 207.269 grams
Average mass change: -0.078 percent
General comments (publicly viewable) (Max 1000 characters): -0.078 + 0.006 = -0.072
Test was verified on 6/2/2025 ✔
