Summary for Test 2013-12-16-11001792-1

Test performed: ASTM C143-10a

Project Information

Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Award Date01/03/2013
Closeout Date09/07/2018
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date12/16/2013 Sample Unique Key11001792
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sample6x12 concrete cylinders The quantity of what the sample constitutes5 Cylinders
From where was the sample collectedOther First name of sampler or witnessed byYusuf
Last name of sampler or witnessed byMalik Title of samplerNot set
Telephone number of sampler(626) 201-5907 Laboratory sample identification2013-12-16-11-00
Linked DIME Sample IDNot set The fabricator/manufacturer/facility nameVulcan Materials - Truck 336
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collectedNot set The batch plant ticket number from where the sample was collected159113000000
Concrete batch plant41951 The fabricator/manufacturer designation for the sampleVulcan Materials Company
A detailed description of where the material sample was collectedRetaining wall at bottom of wall Station 26.37 Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2013-12-16-11001792
DIME Test ID: 2013-12-16-11001792-1
Testing Lab: RMA Group - Rancho Cucamonga
Test Method: ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2014-02-03

Test Results


Input Type: Calculated
Tester's full name: Yusuf Malik
Date of test: 12/16/2013
Slump: 4.5 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/3/2014 ✔