Summary for Test 2025-05-06-69-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 1000346 DEA: 081N6904 EFIS: 0823000037 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-15-36.6/37.0 |
| Award Date | 01/23/2025 |
| Closeout Date | 07/22/2025 |
| Work Description | HMA, ROADWAY EXCAVATION, CLASS 2 AB, REMOVE BASE & SURFACING, RHMA. |
| Location Description | RIVERSIDE COUNTY IN CORONA FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF CAJALCO ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 05/06/2025 | Sample Unique Key | 69 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/02/2025 |
| Sample type | Acceptance | A brief description of the sample | Class II Aggregate Base, Second Lift |
| The quantity of what the sample constitutes | 0.0 kg | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Gabriel | Last name of sampler or witnessed by | Ramirez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-15 SB, Median Below Cajalco Rd Overcrossing, Sta 1935+00 - 1942+87 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2025-05-06-69
DIME Test ID: 2025-05-06-69-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-05-27
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: Yes
Input Type: Calculated
Tester's full name: Gabriel Ramirez
Date of test: 05/06/2025
Sum of Count or Density: 6468 g/cc
Average of Count or Density: 2156 g/cc
Sum of Moisture Count: 489 g/cc
Average of Moisture Count: 163 g/cc
Count Ratio Density: 1.24
Count Ratio Moisture: 0.25
Calculated Percent Relative Compaction: 95.9 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 5/27/2025 ✔
