Summary for Test 2025-05-02-46-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 05/02/2025 | Sample Unique Key | 46 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 05/14/2025 |
| Sample type | Quality Assurance | A brief description of the sample | HRC 500 510 Couplers |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mario | Last name of sampler or witnessed by | Alarcon |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Field | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | cascade |
| Coupler Manufacturer | hrc | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | HRC 500-510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 74137464, 73137344 | Rebar Heat Number(s) | 215324 |
| Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2025-05-02-46
DIME Test ID: 2025-05-02-46-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2025-05-22
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 05/22/2025
UTM: NA
Halo ID: na
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 11 | 1.56 | 0.011 | 153490 | 98500 | ok necking | Kleinfelder |
| 2 | 2 | 1 | 11 | 1.56 | 0000 | 154430 | 99000 | ok necking | Kleinfelder |
| 3 | 3 | 1 | 11 | 1.56 | 0000 | 154550 | 99000 | ok necking | Kleinfelder |
| 4 | 4 | 1 | 11 | 1.56 | 0000 | 154220 | 99000 | ok necking | Kleinfelder |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/22/2025 ✔
