Summary for Test 2024-10-08-157-1
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 66669 DEA: JMF-DATA EFIS: JMF-DATA |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for storing JMF sample data |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 10/08/2024 | Sample Unique Key | 157 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/08/2024 |
| Sample type | Quality Control | A brief description of the sample | Combined RAP |
| The quantity of what the sample constitutes | JMF | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Michael | Last name of sampler or witnessed by | Davis |
| Title of sampler | Not set | Telephone number of sampler | Not set |
| Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
| The fabricator/manufacturer/facility name | Deer Creek Asphalt | Transportation Laboratory (TL) Number | Not set |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Stockpile |
|---|---|---|---|
| Aggregate Size | Not set | Aggregate Source | Not set |
| RAP Stockpile | Not set | Stockpile Size (tons) | Not set |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2024-10-08-157
DIME Test ID: 2024-10-08-157-1
Testing Lab: Jaxon Enterprises - Deer Creek Rock & Asphalt
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2025-05-21
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Michael Davis
Date of test: 05/21/2025
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 94 % | ||||||
| 85 % | ||||||
| 66 % | ||||||
| 54 % | ||||||
| 44 % | ||||||
| 33 % | ||||||
| 22 % | ||||||
| 13 % | ||||||
| 8.2 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Submitted from JMF - Michael Davis
Test was verified on 5/21/2025 ✔
