Summary for Test 2025-05-19-18-4

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 1000369
DEA: 09378804
EFIS: 0919000002
DIST-CO-RTE-PM09-MNO-395-R9.8/R12.6
Award Date08/29/2024
Closeout DateNot set
Work DescriptionPLACE HMA AND ASPHALT BASE, RECYCLE PAVEMENT AND MODIFY ELECTRICAL.
Location DescriptionMONO COUNTY NEAR TOM\\\\\\\\\\\\\\\\'S PLACE FROM 0.5 MILE NORTH OF LOWER ROCK CREEK ROAD TO 1.3 MILES SOUTH OF SOUTH LANDING OVERCROSSING
QA Service Level1 (Verified on 09/02/2024)

Sample Information

Sample Taken Date05/19/2025 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing05/20/2025 Sample typeAcceptance
A brief description of the sampleClass 2 Aggregate Base The quantity of what the sample constitutes2000 cy
From where was the sample collectedJob Site First name of sampler or witnessed byJosh
Last name of sampler or witnessed byHubbart Title of samplerTET
Telephone number of sampler Laboratory sample identification4587
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite 5 Bridges Pit
Transportation Laboratory (TL) NumberAB-01 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)00-00-0000
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedNB 395 Subgrade
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-05-19-18
DIME Test ID: 2025-05-19-18-4
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2025-05-21

Test Results


How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 05/20/2025
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 91 %
As Received Gradation, Percent Passing 1/2 in. sieve: 75 %
As Received Gradation, Percent Passing 3/8 in. sieve: 68 %
As Received Gradation, Percent Passing #4 sieve: 57 %
As Received Gradation, Percent Passing #8 sieve: 47 %
As Received Gradation, Percent Passing #16 sieve: 36 %
As Received Gradation, Percent Passing #30 sieve: 22 %
As Received Gradation, Percent Passing #50 sieve: 11 %
As Received Gradation, Percent Passing #100 sieve: 6 %
As Received Gradation, Percent Passing #200 sieve: 4 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 82 %
As Used Gradation, Percent Passing 3/8 in. sieve: 75 %
As Used Gradation, Percent Passing #4 sieve: 63 %
As Used Gradation, Percent Passing #8 sieve: 52 %
As Used Gradation, Percent Passing #16 sieve: 40 %
As Used Gradation, Percent Passing #30 sieve: 24 %
As Used Gradation, Percent Passing #50 sieve: 12 %
As Used Gradation, Percent Passing #100 sieve: 7 %
As Used Gradation, Percent Passing #200 sieve: 4.4 %
R value: 80
General comments (publicly viewable) (Max 1000 characters): AB-01

Test was verified on 5/21/2025 ✔