Summary for Test 2025-05-02-45-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 995361
DEA: 072XF604
EFIS: 0723000126
DIST-CO-RTE-PM07-VEN-33-24.25/27.3
Award Date03/02/2023
Closeout DateNot set
Work DescriptionRebuild the eroded side slopes, rebuild the damaged shoulders, reconstruct the dike, repair the sinkhole on the shoulder, repair the eroded areas next to EP, behind guardrail, and around the flumes, reinstall guardrail, rebuild RSP, clean the drainage systems, construct a SPW
Location DescriptionNot set
QA Service Level1 (Verified on 11/27/2023)

Sample Information

Sample Taken Date05/02/2025 Sample Unique Key45
Date that the sample was received by the laboratory/organization performing the testing05/02/2025 Sample typeAcceptance
A brief description of the sampleRetaining Wall No. 2475L sta. 10+00-11+80 The quantity of what the sample constitutes400 sy
From where was the sample collectedJob Site First name of sampler or witnessed bySopheak
Last name of sampler or witnessed byChong Title of samplerTEC
Telephone number of sampler2138170174 Laboratory sample identification25-1417
Linked DIME Sample ID The fabricator/manufacturer/facility nameNA
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameRetaining Wall No. 2475L sta. 10+00-11+80
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleEmbankment
The fabricator/manufacturer designation for the samplevarious Embankment A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite

Test Details

DIME Sample ID: 2025-05-02-45
DIME Test ID: 2025-05-02-45-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2025-05-15

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Sopheak Chong
Date of test: 05/15/2025
Gage No.: 60137
Test No.: 1
Nuclear By: Sopheak Chong
Non-Bias Plan No.: 2
Depth: 12"
Material No.: Native
Material Type: Embankment
Impact By: Sopheak Chong
Standard Count Density: 2180 g/cc
Count or Density 1: 2.22 g/cc
Count or Density 2: 2.24 g/cc
Count or Density 3: 2.22 g/cc
Standard Count Moisture: 652 g/cc
Moisture Count 1: 0.19 g/cc
Moisture Count 2: 0.19 g/cc
Moisture Count 3: 0.18 g/cc
Sum of Count or Density: 6.68 g/cc
Average of Count or Density: 2.23 g/cc
Sum of Moisture Count: 0.56 g/cc
Average of Moisture Count: 0.19 g/cc
Calculated Percent Relative Compaction: 96.8 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/15/2025 ✔