Summary for Test 2025-04-22-78-5
Test performed: AASHTO T84-14Project Information
| Project Identifiers | Project ID: 1001178 DEA: 020J3904 EFIS: 0219000112 |
|---|---|
| DIST-CO-RTE-PM | 02--- |
| Award Date | 08/01/2024 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 04/14/2025) |
Sample Information
| Sample Taken Date | 04/22/2025 | Sample Unique Key | 78 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/23/2025 |
| Sample type | Production Start-Up | A brief description of the sample | Combined Untreated 3/4-inch Virgin Aggregate |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Source |
| First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79858 | Linked DIME Sample ID | 2025-04-22-51, 2025-04-22-52, 2025-04-22-53 |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt — Fawndale Rock Quarry (Redding, CA) | Transportation Laboratory (TL) Number | 851395 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-45-0017:: Fawndale Rock Quarry (Redding, CA) |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Laboratory Batched from Untreated Sized Virgin Aggregate Stockpile Samples | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-04-22-78
DIME Test ID: 2025-04-22-78-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T84-14: Standard Method of Test for Specific Gravity and Absorption of Fine Aggregate (Fine Specific Gravity)
Test Release Date: 2025-05-13
Test Results
Input Type: Measured
Tester's full name: Josh Murphy
Date of test: 05/13/2025
Mass of saturated surface dry sample (before pycnometer) (S): 502.7 grams
Mass of the pycnometer with water and aggregate (C): 963.0 grams
Mass of the pycnometer with water (B): 648.9 grams
Mass of the oven dried sample (before pycnometer) (A): 491.5 grams
Mass of the saturated surface dry aggregate (for absorption) (S): 502.7 grams
Mass of the oven dry aggregate (for absorption) (A): 491.5 grams
Test Sample Preparation: Total Saturation
Bulk specific gravity: 2.606
Bulk specific gravity (SSD Basis): 2.665
Apparent specific gravity: 2.771
Absorption: 2.3 %
General comments (publicly viewable) (Max 1000 characters): Gsbvf(unwashed)=2.606
Test was verified on 5/13/2025 ✔
