Summary for Test 2025-04-17-68-7
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 1001208 DEA: 022K6204 EFIS: 0225000120 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96-46.6/46.6 |
| Award Date | 02/28/2025 |
| Closeout Date | 07/14/2025 |
| Work Description | Siskiyou 96 Potential Landslide DO Storm Damage |
| Location Description | IN SISKIYOU COUNTY NEAR HAPPY CAMP AT 2.3 MILES EAST OF GORDONS FERRY ROAD |
| QA Service Level | 1 (Verified on 04/22/2025) |
Sample Information
| Sample Taken Date | 04/17/2025 | Sample Unique Key | 68 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/17/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 3/4-inch Type A HMA (eq. PG 64-16) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Giuliano | Last name of sampler or witnessed by | Giuntoli |
| Title of sampler | Tester | Telephone number of sampler | |
| Laboratory sample identification | D79857 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 823563 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-04-17-68
DIME Test ID: 2025-04-17-68-7
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2025-05-08
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method:
Input Type: Measured
Tester's full name: Dennis Hckey
Date of test: 04/28/2025
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: no data
Air Void Content for specimen A-2: no data
Air Void Content for specimen B-1: no data
Air Void Content for specimen B-2: no data
Stripping Inflection Point (Wheel A): >15000
Stripping Inflection Point (Wheel B): >15000
Maximum impression at 5000 passes (left wheel): 1.37 mm
Maximum impression at 5000 passes (right wheel): 1.28 mm
Average impression at 5000 passes (left/right avg): 1.33 mm
Maximum impression at 10000 passes (left wheel): 1.62 mm
Maximum impression at 10000 passes (right wheel): 1.6 mm
Average impression at 10000 passes (left/right avg): 1.61 mm
Maximum impression at 15000 passes (left wheel): 1.81 mm
Maximum impression at 15000 passes (right wheel): 1.88 mm
Average impression at 15000 passes (left/right avg): 1.85 mm
Maximum impression at 20000 passes (left wheel): no data
Maximum impression at 20000 passes (right wheel): no data
Average impression at 20000 passes (left/right avg): no data
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: no data
General comments (publicly viewable) (Max 1000 characters): CT 360:
SA=0.5g/cm²;
CT 389:
Nf>15000,
SIP>15000
Test was verified on 5/8/2025 ✔
