Summary for Test 2025-04-22-50-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1001178 DEA: 020J3904 EFIS: 0219000112 |
|---|---|
| DIST-CO-RTE-PM | 02--- |
| Award Date | 08/01/2024 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 04/14/2025) |
Sample Information
| Sample Taken Date | 04/22/2025 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/23/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 1 bag of Combined RAP |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79859B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 823625 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Fawndale Rock and Asphalt, Redding, CA |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-04-22-50
DIME Test ID: 2025-04-22-50-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-04-29
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean Mcwithey
Date of test: 04/24/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3029.9 g
Mass of the specimen and specimen basket assembly prior to ignition: 4645.2 g
Mass of HMA Sample prior to ignition: 1615.3 g
Mass Loss: 101.4 g
Mass of aggregate remaining after ignition: 1513.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.09 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.09
Test was verified on 4/29/2025 ✔
