Summary for Test 2025-04-18-3-8
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 1000166 DEA: 101P7204 EFIS: 1022000156 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-R19.6/R24.0 |
| Award Date | 05/10/2024 |
| Closeout Date | 09/24/2025 |
| Work Description | POLYESTER CONCRETE OVERLAY, STRUCTURAL CONCRETE, COLD PLANE AND HMA. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON AT VARIOUS LOCATIONS FROM ROTH ROAD UNDERCROSSING TO WALKER SLOUGH BRIDGE |
| QA Service Level | 1 (Verified on 03/11/2024) |
Sample Information
| Sample Taken Date | 04/18/2025 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/18/2025 |
| Sample type | Acceptance | A brief description of the sample | Skid Test Request |
| The quantity of what the sample constitutes | Multiple Lanes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ron | Last name of sampler or witnessed by | Matin |
| Title of sampler | Structure Representative | Telephone number of sampler | 2096394782 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Myers and Sons Construction | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 29-0216R and Various | |
| Structure name | Roth Road UC and Various | Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | 10-SJ-5 |
| Direction of Travel | North | Post Mile | 19.58 |
| Lanes to be Tested | Shoulder,Lane #1,Lane #2,Lane #3 | Station |
Test Details
DIME Sample ID: 2025-04-18-3
DIME Test ID: 2025-04-18-3-8
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-05-08
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 04/23/2025
Air Temperature: 58
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 30
Reference Distance 2: 33
Reference Distance 3: 36
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 17
Position for Stationing 2: 17
Position for Stationing 3: 17
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.38
Corrected Coefficients of Friction for Stationing 3: 0.36
Average Coefficient of Friction: 0.36
General comments (publicly viewable) (Max 1000 characters): MATHEWS UC SB. TESTED ENTIRE BRIDGE MULTIPLE LANES AND APPROACH/DEPARTURE SLABS ALL WITHIN SPECS WITH AN AVG OF .36
Test was verified on 5/8/2025 ✔
