Summary for Test 2025-04-15-6-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 212861
DEA: 101H2804
EFIS: 1017000190
DIST-CO-RTE-PM10-STA-5-10.7/25.5
Award Date02/06/2024
Closeout DateNot set
Work DescriptionBRIDGE DECK OVERLAY WITH POLYESTER CONCRETE, REPLACE APPROACH SLABS & JOINT SEALS IN STANISLAUS COUNTY ON STATE ROUTE 5 FROM FINK ROAD UC TO KHALSA ROAD UC.
Location DescriptionSTANISLAUS AND MERCED COUNTIES.
QA Service Level1 (Verified on 03/23/2020)

Sample Information

Sample Taken Date04/15/2025 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing04/15/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed bySai Last name of sampler or witnessed byKasaraneni
Title of samplerWilliam Chen Telephone number of sampler5105172038
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMyers and Sons Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier38-0114L
Structure nameFink Road UC Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE10-Sta-5
Direction of TravelSouth Post Mile10.71
Lanes to be TestedLane #1 Station

Test Details

DIME Sample ID: 2025-04-15-6
DIME Test ID: 2025-04-15-6-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-04-25

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 04/15/2025
Air Temperature: 60
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF ROAD EDGE
Reference Distance 1: 15
Reference Distance 2: 18
Reference Distance 3: 21
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.38
Corrected Coefficients of Friction for Stationing 2: 0.39
Corrected Coefficients of Friction for Stationing 3: 0.39
Average Coefficient of Friction: 0.39
General comments (publicly viewable) (Max 1000 characters): TESTED APPROACH SLABS AND DEPARTURE SLABS BOTH MET SPECS WITH AVG OF .38

Test was verified on 4/25/2025