Summary for Test 2025-04-07-2-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 04/07/2025 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/09/2025 |
| Sample type | Quality Assurance | A brief description of the sample | #6 rebar 3'-0" Lot 1 hoops |
| The quantity of what the sample constitutes | 150 pcs. | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Joaquin | Last name of sampler or witnessed by | Moreno |
| Title of sampler | Telephone number of sampler | 7146990897 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 378524 |
| Hoop Manufacturer Lot Number(s) | 378524 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | #6 |
| Diameter of Hoop | 3'-0" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | Cascade |
| Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2025-04-07-2
DIME Test ID: 2025-04-07-2-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2025-04-25
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 04/25/2025
UTM: NA
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 6 | 0.44 | 45250 | 103000 | ok necking | Kleinfelder |
| 2 | 2 | 1 | 6 | 0.44 | 42880 | 97500 | ok necking | Kleinfelder |
| 3 | 3 | 1 | 6 | 0.44 | 44200 | 100000 | ok necking | Kleinfelder |
| 4 | 4 | 1 | 6 | 0.44 | 43470 | 99000 | ok necking | Kleinfelder |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/25/2025 ✔
