Summary for Test 2025-03-19-54-2

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 44444
DEA: ASCP
EFIS: ASCP
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Asphalt Supplier Certification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date03/19/2025 Sample Unique Key54
Date that the sample was received by the laboratory/organization performing the testing03/19/2025 Sample typeVerification
A brief description of the sample64-28M The quantity of what the sample constitutes1 can
From where was the sample collectedSource First name of sampler or witnessed byDaniel
Last name of sampler or witnessed byVirkler Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID2025-03-19-21 The fabricator/manufacturer/facility nameErgon Asphalt and Emulsions
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number Tank number19
Time of sample0730 HMA Supplier
Certified Asphalt SupplierErgon Asphalt & Emulsions Incorporated - Las Vegas NV MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2025-03-19-54
DIME Test ID: 2025-03-19-54-2
Testing Lab: ABT Group
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2025-04-22

Test Results


Input Type: Calculated
Tester's full name: ABT
Date of test: 04/10/2025
% Elongation Recovery: 91 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/22/2025 ✔