Summary for Test 2025-04-09-4-2

Test performed: CTM 342-August 2012
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 994751
DEA: 010C5004
EFIS: 0112000292
DIST-CO-RTE-PM01-HUM-36-11.3/34.6
Award Date03/02/2023
Closeout DateNot set
Work DescriptionProject Name: Bridge Rail Replacement - 3 Bridges
Location DescriptionHely Creek, Little Larabee Creek and Butte Creek Bridge.
QA Service Level1 (Verified on 04/27/2023)

Sample Information

Sample Taken Date04/09/2025 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing04/09/2025 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutes1 lane
From where was the sample collectedJob Site First name of sampler or witnessed byShantanu
Last name of sampler or witnessed byNalawade Title of samplerStructure Representative
Telephone number of sampler7072966324 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMercer Fraser - Fortuna
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier04-0315 Structure nameHelly Creek
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE01-HUM-36
Direction of TravelEast Post Mile11.46
Lanes to be TestedLane #2 Station

Test Details

DIME Sample ID: 2025-04-09-4
DIME Test ID: 2025-04-09-4-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-04-17

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 04/17/2025
Air Temperature: 46
Tire Pressure: 25
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Bridge Wall
Reference Distance 1: 9
Reference Distance 2: 12
Reference Distance 3: 15
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Corrected Coefficients of Friction for Stationing 1: 0.36
Corrected Coefficients of Friction for Stationing 2: 0.35
Corrected Coefficients of Friction for Stationing 3: 0.34
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/17/2025 ✔

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.