Summary for Test 2025-04-09-4-2

Test performed: CTM 342-August 2012
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 994751
DEA: 010C5004
EFIS: 0112000292
DIST-CO-RTE-PM01-HUM-36-11.3/34.6
Award Date03/02/2023
Closeout DateNot set
Work DescriptionProject Name: Bridge Rail Replacement - 3 Bridges
Location DescriptionHely Creek, Little Larabee Creek and Butte Creek Bridge.
QA Service Level1 (Verified on 04/27/2023)

Sample Information

Sample Taken Date04/09/2025 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing04/09/2025
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutes1 lane From where was the sample collectedJob Site
First name of sampler or witnessed byShantanu Last name of sampler or witnessed byNalawade
Title of samplerStructure Representative Telephone number of sampler7072966324
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMercer Fraser - Fortuna Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier04-0315
Structure nameHelly Creek Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE01-HUM-36
Direction of TravelEast Post Mile11.46
Lanes to be TestedLane #2 Station

Test Details

DIME Sample ID: 2025-04-09-4
DIME Test ID: 2025-04-09-4-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2025-04-17

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 04/17/2025
Air Temperature: 46
Tire Pressure: 25
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Bridge Wall
Reference Distance 1: 9
Reference Distance 2: 12
Reference Distance 3: 15
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 9
Position for Stationing 2: 9
Position for Stationing 3: 9
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Corrected Coefficients of Friction for Stationing 1: 0.36
Corrected Coefficients of Friction for Stationing 2: 0.35
Corrected Coefficients of Friction for Stationing 3: 0.34
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/17/2025

Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only.